NWR Module Project
Project:NWR Client:Air Liquid End-user:NWR Product:151 x Modules + Piping Prefabrication: Pre-Assembled Process Unit (PAU) Pre-Assembled Pipe Rack (PAR) Total Weight:25,000MT Delivery Time:2016 Location:Alberta,Canada
SHELL – FRANKLIN PIPE PREFABRICATION
Project:SHELL – FRANKLIN PIPE PREFABRICATION Client:BECHTEL End-user:Shell Product:1,000,000+ DIA-INCH Delivery Time: 2019 Location: Pennsylvania, USA
LNGC MEH Project
Project:LNGC MEH Project Client: JFJV End-user:LNG Canada Development Inc Total weight: 7,000T Delivery time: 2021.01 Location: Kitimat, BC, Canada
MdA Expansion Phase I Project-SS ATM Vessels
Project:MdA Expansion Phase I Project-SS ATM Vessels Client: Wood End-user:Livent Product:Vessel Delivery time: 2019.09 Location: Argentina
Chandler S210
Project : Chandler S210 Client: Air Products Product: Cold Box Delivery Time: 2020.1 Location: USA
Halfaya Project Surface Facility Phase Three Water Injection Boosting Station Upgrade
Project:Halfaya Project Surface Facility Phase Three Water Injection Boosting Station Upgrade Client: CNECC End-user:CPECC Product: Skid Delivery Time: 2019.10 Location: Iraq
Solution
Module
Skid
Cold Box
Pressure Vessel
Piping
Structural Steel
E-house
About Yanda
Other group companies
Organizational
History of development
Qualification Honor
IP Protection&Transparency
Business
Engineering
Procurement
Fabrication
Installation
Maintenance
Clients&Markest
Project Reference
Management System
Safety management system
Quality management system
Project management system
Facility&Equipment
Wharf
Facilities
Contact us
Copyright © yanda 2020 | All Right Reserved.