Loading Process

Handling
Handling technology of raw material berth
Shipping technology
Shipping technology of large parts in semi submersible barge berth

Raw material berth loading and unloading process

According to the features of the berthing ship types, loading and unloading cargo types, land area of harbor and port logistics conditions, the port's raw material berth loading and unloading are handled by mobile cranes, and the goods are transported by traction flatbed trucks.


Loading process of large-size semi-submersible barge berth

The semi-submersible barge berth for large-size shipment adopts roll-on/roll-off process. Roll-on /roll-off is the rolling of cargo from the wharf onto or off the cargo deck of the semi-submersible ship by self-propelled flatbed truck or tracion moving device, or roll off the cargo deck.



Loading process of rough products:0102030405

Ship unloading process:0504020301

01

Rear yard or plant area

02

Tractor

03

Flat car

04

Truck crane

05

Ship

Loading process of semi submersible barge berth:0102030405(Current operation mode)

Loading process of semi submersible barge berth:010605(Intelligent mode)

01

Assembly area of slideway

02

Tractor

03

Flat car

04

Truck crane

05

Ship

06

Hydraulic remote control self-propelled power module flat car